Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6260 All-Purpose Hair and Body Bar - Happi

All-Purpose Hair and Body Bar

All-Purpose Hair and Body Bar
Ingredients
%

Phase A

  • Deionized water
  • 29.00
  • Endinol SCS (Coast Southwest, Inc.) (Sodium coco-sulfate)
  • 10.00

Phase B

  • Olivatis 19 (Coast Southwest, Inc., Medolla Limited) (Olive oil polyglyceryl-6 esters (and) phospholipids)
  • 2.00
  • Jojoba Oil (Coast Southwest, Inc.) (Simmondsia chinensis (jojoba) seed oil)
  • 8.00
  • Certified Organic Extra Virgin Olive Oil (Coast Southwest)(Oleo europaea (olive) fruit oil)
  • 9.00
  • Sunflower Oil (Coast Southwest, Inc.) (Helianthus annuus (sunflower) seed oil)
  • 9.00
  • Coconut Oil (Coast Southwest, Inc.)(Cocos nucifera (coconut) oil)
  • 6.00
  • Olivatis 18 (Coast Southwest, Inc., Medolla Limited) (Olive oil polyglyceryl-6 (and) sodium stearoyl lactylate (and) cetearyl alcohol)
  • 4.00
  • Stearic Acid (Coast Southwest, Inc.) (Stearic acid)
  • 11.00
  • Palmitic Acid (Coast Southwest, Inc.) (Palmitic acid)
  • 11.00

Phase C

  • Peppermint Essential Oil (Coast Southwest, Inc.) (Mentha piperita (peppermint) oil)
  • 1.00

Phase D

  • NaOH 30% wt./wt. (Coast Southwest, Inc.) (Sodium hydroxide)
  • q.s.

Procedure

Phase A – Add Phase A materials in order into a vessel under shear mixing. Begin heating to 176°F (80°C). Phase B – Add Phase B to separate vessel under shear mixing. Heat to 176°F (80°C). Once both vessels are uniform and at heat, add Phase A to Phase B separate vessel slowly, increasing shear mixing speed. Begin cool down. Phase C – Once batch has reached 149°F to 158°F (65°C to 70°C), add Phase C to batch with continued shear mixing. Phase D – Begin adding Phase D in a dropwise manner to the batch. Batch will begin to thicken. Once batch has reached a pH of 8.5 to 9.0 place in desired mold. Press and allow to set for at least 24 to 48 hours.

More Information

Coast Southwest, Inc. Tel.: 800-621-0500 Email: info@coastsouthwest.com Website: www.coastsouthwest.com